Procedure
ARIMA forecasting models depend on the parameters and lead times:
- AR(1):
- MA(1): gives
- Random Walk with Drift: gives
- ARMA(p,q): Forecasts for long lead times depend on autoregressive parameters and the mean.
- Nonstationary Models: The error variance grows without bound as the lead time increases.