Procedure

ARIMA forecasting models depend on the parameters and lead times:

  • AR(1):
  • MA(1): gives
  • Random Walk with Drift: gives
  • ARMA(p,q): Forecasts for long lead times depend on autoregressive parameters and the mean.
  • Nonstationary Models: The error variance grows without bound as the lead time increases.